donderdag 13 december 2012

M4A3E8, build part I

Building the T66 Tracks
Cleanup of 300 pieces plastic is a boring job, this is done first while the motivation is still there. The result is two tracks of 76 links.

Lower hull, drive sprockets, idler wheels and transmission housing
The lower hull and transmission housing is made of multiple arts that should be build in one session to ensure everything fits together and is straight.

Lower and upper hull dry fitted
The lower hull, transmission housing and upper hull are dry fitted to ensure everything fits and there are no gaps.

Geen opmerkingen:

Een reactie posten